Stopband F1910~1930MHz, ≥50dB, PassbandDC~1902MHz, 1938~4500MHz, SMA
To check stock availability, search under "In-stock Products" on the Dianzibuy store.
Any change to the content of this page is subject to change without notice. Please confirm the specifications before ordering.
Products must not be used for any unlawful purpose; the customer bears any loss arising from unlawful use.
High rectangular coefficient, low loss, high power
| Parameters | / | Min | Typical | Max | Units |
|---|---|---|---|---|---|
| Stopband F | 1910 | ~ | 1930 | MHz | |
| Stopband Rej. | ≥ | 50 | dB | ||
| Passband | DC | ~ | 1902 | MHz | |
| Passband | 1938 | ~ | 4500 | MHz | |
| Passband IL | 3 | dB | |||
| Passband VSWR | 1.8 |
| Connector | SMA-K |
| Connector material | Housing 304 stainless steel |
| Impedance | 50Ω |
| Surface | Black baking paint |
| Power | 50W Design assurance |

| Frequency(MHz) | S12 IL dB | S11 VSWR |
|---|---|---|
| 1850 | -0.31 | 1.36 |
| 1902 | -2.43 | 1.29 |
| 1904 | -3.35 | 2.85 |
| 1906 | -11.38 | 10.36 |
| 1908 | -33.72 | 23.75 |
| 1910 | -68.82 | 31.41 |
| 1915 | -62.67 | 32.14 |
| 1920 | -72.28 | 33.68 |
| 1925 | -58.67 | 46.38 |
| 1930 | -80.62 | 44.77 |
| 1932 | -34.51 | 27.46 |
| 1934 | -11.43 | 12.86 |
| 1936 | -3.98 | 3.33 |
| 1938 | -2.36 | 1.31 |
| 2000 | -0.42 | 1.43 |



| 1 | Please do not wash the product in the cleaning solution.,Please do not wash the product in the cleaning solution. |
| 2 | If the temperature is higher than 125℃, consult with us before ordering. |
Send us your requirements — our engineers will respond within one working day.