HotLine (+86) 15608095669 中文 / EN
Categories
Categories Attenuator
DA8-1020-0-18G-9210 Attenuator
Attenuator

Attenuator DA8-1020-0-18G-9210

FrequencyDC~18GHz, Attenuation10dB, 20W, 50Ω, N-MF

Model
DA8-1020-0-18G-9210
Stock
In stock: 14 View price or buy it
Address
BLD# 4-3A, No. 118 Hangtian Road, Chenghua District, Chengdu, Sichuan, China.

To check stock availability, search under "In-stock Products" on the Dianzibuy store.
Any change to the content of this page is subject to change without notice. Please confirm the specifications before ordering.
Products must not be used for any unlawful purpose; the customer bears any loss arising from unlawful use.

Specifications

Brand
COM-MW
RoHS
Yes
Net Weight
86 g
Warranty
1-year warranty

Downloads

Description

Main specifications

ParametersMinTypicalMaxUnits
FrequencyDC~18GHz
Attenuation9.21010.8dB
VSWR1.3

Other parameters

Power Capacity20W
Peak power500W设计保证,占空比1%,脉冲宽度5uS
Impedance50Ω
ConnectorN -MF
Connector materialStainless steel 303
SurfaceBlack anodizing
Product shell material硬铝6061
Operation Temp.-55~+125℃ Design assurance
Weight176g
ROHSCompliant Available

Typical test curve

Power Derating Curve

Reference picture

Configuration(mm)

Typical test data

Frequency GHzS11 VSWRS22 VSWRS12 Attenuation
0.011.021.01-9.75
1.301.031.02-9.84
2.581.051.04-9.86
3.871.071.06-9.88
5.151.071.06-9.91
6.441.091.08-9.87
7.721.101.08-9.89
9.011.101.08-9.89
10.291.061.03-9.91
11.581.001.05-9.92
12.861.071.11-9.93
14.151.141.16-9.98
15.431.201.20-9.98
16.721.231.24-9.93
18.001.181.22-9.86

Note

1. When installing attenuators, it is necessary to consider sufficient heat dissipation space and avoid installing them next to equipment with high heat output, otherwise the power capacity will decrease;

2. Small power attenuators do not have input and output directions, nor do they indicate directions. When high-power attenuators have input and output port markings, they must be connected to the equipment in the specified direction, otherwise the attenuator may burn out.

Need custom specifications?

Send us your requirements — our engineers will respond within one working day.